What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed for public protection during construction work under job#m01169191-i1-gc. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story office building built in 1915, with 30 homes, on a 8,888 sq ft lot.
- Built
- 1915
- Last altered
- 2005
- Floors
- 9
- Residential units
- 30
- Building type
- Office building
- Land use
- Mixed residential and commercial
- Zoning district
- R8B
- Lot area
- 8,888 sq ft
- Building area
- 65,482 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 54 notices on file; the most recent was issued May 7, 2025.
- Failure to correct swarmp conditions (facade)
Issued May 7, 2025 — CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 19, 2025 — CYCLE 9B UNSAFE REPORT FILED
- Failure to
Issued May 3, 2012 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01169191-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01169191-S1
- BIN
- 1043155
- BBL
- 1014100064
- Postal code
- 10021 · 436 filings
- Review type
- Professional Certification
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 0
- Proposed dwelling units
- 0