NYC DOB record · B00122782-I1

122 Montague Street

122 Montague Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00122782-I1

122 Montague Street

Brooklyn, NY 11201

Alteration filing · status dated Dec 28, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00122782-I1 as a alteration filing at 122 Montague Street, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
Complete building dossierView all 2 filings associated with BIN 3002066Applicant of recordSee the 8 filings that name Craft Design Architecture PLLC
FiledApr 16, 2019
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Install new sign band, new awning and new bracket sign along with associated trim work as outlined in drawings and as approved by LPC

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story mainly residential with some commercial built in 1849, with 3 homes, on a 2,500 sq ft lot.

Built
1849
Last altered
1988
Floors
5
Residential units
3
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
2,500 sq ft
Building area
6,800 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 16 notices on file; the most recent was issued Aug 26, 2026.

  • Landmark

    Issued Aug 26, 2026

  • Landmark

    Issued Oct 26, 2022

  • Construction

    Issued May 3, 1999 — WORK WITHOUT A PERMIT. WORK NOTED: ENCLOSURE (WOOD) ERECTED AT REAR OF KITCHEN REMEDY: OBTAIN PERMITS AND APPROVALS FROM DOB IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDIITON

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00122782-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00122782-I1
BBL
3002480035
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source