NYC DOB record · Q01481260-I1

123-33 83 Avenue

123-33 83 Avenue, Queens, NY 11415

Alteration filing in Kew Gardens, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01481260-I1

123-33 83 Avenue

Queens, NY 11415

Alteration filing · status dated Nov 23, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01481260-I1 as a alteration filing at 123-33 83 Avenue, Queens, NY 11415. Its latest published status category is Approved, dated Nov 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 92 filings that name Streamline Consultants NY
FiledOct 29, 2026
Current recordApproved
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Inspection using industrial rope access techniques and methods. See attached plans; designated primary site supervisor: GABRIEL HURTADO

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 59 notices on file; the most recent was issued Aug 9, 2023.

  • Plumbing

    Issued Aug 9, 2023 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED CRACKED HUB FITTING IN CELLAR LEVEL OF PARKING GARAGE

  • Construction

    Issued Apr 25, 2023 — CRACKS ON THE GARAGE CEILING AT VARIOUS AREAS WITH EXPOSED REBARS. SPALLING CONCRETE THROUGHOUT THE GARAGE.

  • Facade safety program

    Issued Aug 23, 2019 — UNSAFE REPORT FILED

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 25, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01481260-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01481260-I1
BIN
4533202
BBL
4033609001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source