What the filing says
A public-record reading of the proposed work.
Parapet wall replacement as per plan. no change in use, egress or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1931, on a 1,151 sq ft lot.
- Built
- 1931
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R6B
- Lot area
- 1,151 sq ft
- Building area
- 1,150 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 14 notices on file; the most recent was issued Aug 5, 2026.
- Construction
Issued Aug 5, 2026 — EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO DEMO THE ENT EXP1 PARAPT UNDR EMRGNCY WRK NYSPE TO PRVDE WRITTEN MEANS&METHD
- Construction
Issued Aug 5, 2026 — FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD ROOF MEMBRANE REPEATEDLY TORN & PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF REPAIR
- Construction
Issued Aug 5, 2026 — FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD MASONRY PARAPT WALL@EXP1 TO BE IN A STATE IF SEVERE DISREPAIR,LEANING SIGNIFICANTLY&HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHD SUGGESTNG CONT OUTW.SBMT ANNUAL PARAPET OBSRVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/26 TO ANKMIOTEK@BUILDINGS.NYC.GOV
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01445124-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01445124-I1
- BBL
- 4095780004
- Postal code
- 11419 · 104 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0