NYC DOB record · B01365588-S1

124 8 Street

124 8 Street, Brooklyn, NY 11215

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01365588-S1

124 8 Street

Brooklyn, NY 11215

Alteration filing · status dated Aug 31, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01365588-S1 as a alteration filing at 124 8 Street, Brooklyn, NY 11215. Its latest published status category is Approved, dated Aug 31, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 31, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 83 filings that name Neville Engineering Group
FiledMay 20, 2026
Current recordApproved
Proposed scale3 stories
Recorded cost$237,500

What the filing says

A public-record reading of the proposed work.

Proposed replacement of plumbing fixtures throughout building including sanitary, storm, water piping, HWH's, gas piping and appliances. No change to use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1899, on a 2,500 sq ft lot.

Built
1899
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
M2-1
Lot area
2,500 sq ft
Building area
1,716 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01365588-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01365588-S1
BIN
3022006
BBL
3010020016
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
plumbing