NYC DOB record · B01434104-I1

124 GAR Clara Street

124 GAR Clara Street, Brooklyn, NY 11218

Alteration filing in Kensington, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01434104-I1

124 GAR Clara Street

Brooklyn, NY 11218

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01434104-I1 as a alteration filing at 124 GAR Clara Street, Brooklyn, NY 11218. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 49 filings that name Kn3 Engineering LLC
FiledJul 27, 2026
Current recordApproved
Proposed scale1 stories
Recorded cost$4,224

What the filing says

A public-record reading of the proposed work.

Garage repairs. cracked stucco & masonry wall to be repaired. securing sister joists & fastening of exist.ing ceiling plywood sheating to the existing roof joists. existing concrete on grade to be patched. no change of use, bulk, egress, and occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1920, with 3 homes, on a 2,450 sq ft lot.

Built
1920
Last altered
2011
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5
Lot area
2,450 sq ft
Building area
2,360 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Dec 26, 2025.

  • Construction

    Issued Dec 26, 2025 — FTC W/COMMISSIONER'S ORDER-CONTROL#348318 VIO#102225PI31201TC DATED 10/22/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 11/21/26. AS OF TODAY 12/26/25 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348318 VIO#102225PI31201TC

  • Construction

    Issued Oct 22, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD CRACKS & BULGING AT EXP4 ROOF SAGGING. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN BY 11/21/25 ADDRESSING ALL COND BLDG TO BE REPAIRED UNDER PERMIT STARTING 12/21/25 AND COMPLETED/SIGN OF BY 1/20/26

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01434104-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01434104-I1
BIN
3357413
BBL
3053080031
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work