What the filing says
A public-record reading of the proposed work.
Application filed to restore/ repair structure in compliance with U.B. 11881 as per plans filed.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story health facility built in 1929, with 65 homes, on a 16,000 sq ft lot.
- Built
- 1929
- Floors
- 4
- Residential units
- 65
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R3X
- Lot area
- 16,000 sq ft
- Building area
- 15,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 47 open notices on record for this building, out of 59 notices on file; the most recent was issued Jun 25, 2026.
- Unsafe
Issued Jun 25, 2026
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
44 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01050842-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01050842-I1
- BIN
- 4305094
- BBL
- 4162350039
- Postal code
- 11694 · 34 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 52
- Proposed dwelling units
- 52