What the filing says
A public-record reading of the proposed work.
Construction of dunnage for mechanical systems and support of chilled water risers (22-41st floor). Approximately 900 linear feet of steel proposed
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 40-story condominium built in 1970, on a 54,023 sq ft lot.
- Built
- 1970
- Floors
- 40
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C5-5
- Lot area
- 54,023 sq ft
- Building area
- 1,051,990 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 280 notices on file; the most recent was issued Jan 13, 2010.
- Elevator
Issued Jan 13, 2010
- Elevator
Issued Nov 7, 2005
- Local law 11/98 - facade
Issued Aug 8, 2002
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00552762-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00552762-I1
- BBL
- 1000057501
- Postal code
- 10004 · 110 filings
- Review type
- Standard Plan Examination
- Existing stories
- 40
- Proposed stories
- 40
- Existing dwelling units
- 0
- Proposed dwelling units
- 0