NYC DOB record · B01320853-I1

125 Summit Street

125 Summit Street, Brooklyn, NY 11231

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01320853-I1

125 Summit Street

Brooklyn, NY 11231

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01320853-I1 as a alteration filing at 125 Summit Street, Brooklyn, NY 11231. Its latest published status category is Approved, dated Sep 16, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 128 filings that name Anz Consulting Engineering, PLLC
FiledSep 3, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$263,000

What the filing says

A public-record reading of the proposed work.

Removal of existing HVAC system and install new HVAC and Ventilation system for the building as per plans , no change in use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story place of worship built in 1920, on a 30,000 sq ft lot.

Built
1920
Floors
2
Residential units
1
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R6B
Lot area
30,000 sq ft
Building area
21,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 9 notices on file; the most recent was issued Jun 1, 1994.

  • Local law 62/91 - boilers

    Issued Jun 1, 1994

  • Local law 62/91 - boilers

    Issued Jun 1, 1994

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01320853-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01320853-I1
BIN
3004886
BBL
3003540001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0