NYC DOB record · M01294322-S8

125 White Street

125 White Street, Manhattan, NY 10013

New building filing in Tribeca-Civic Center, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 5, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01294322-S8

125 White Street

Manhattan, NY 10013

New building · status dated Oct 1, 2026

Current record
Approved
Proposed scale
16 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01294322-S8 as a new building at 125 White Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Oct 1, 2026. The filing records 16 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 1, 2026
Proposed scale
16 proposed stories
The building, not the filingopen housing violations and every filing at BIN 1091892Applicant of recordSee the 117 filings that name Langan Engineering
FiledSep 14, 2026
Current recordApproved
Proposed scale16 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Curb Cut #3 Centre Street Sally port vehicular entrance

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 24-story other built in 1939, on a 173,338 sq ft lot.

Built
1939
Last altered
2023
Floors
24
Residential units
0
Building type
Other
Land use
Public facilities and institutions
Zoning district
C6-4
Lot area
173,338 sq ft
Building area
1,106,962 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 5, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01294322-S8.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,302 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01294322-S8
BBL
1001670001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
16
Existing dwelling units
Empty in the source
Proposed dwelling units
0