What the filing says
A public-record reading of the proposed work.
Removal of exist. stormwater mgmt. sys. consisting of yard drains, inlets, catch basins, and storm piping. Installation of new drainage structures (inlets, catch basins, manholes, & trench drains), infiltration trench, perm pavers, roof drain & storm pipe
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story outdoor recreation facility built in 2025, on a 354,098 sq ft lot.
- Built
- 2025
- Last altered
- 2025
- Floors
- 1
- Residential units
- 0
- Building type
- Outdoor recreation facility
- Land use
- Open space and outdoor recreation
- Zoning district
- R6
- Lot area
- 354,098 sq ft
- Building area
- 11,307 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01011532-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
Scope and identifiers
The details used to match this filing.
- DOB filing number
- B01011532-S2
- BBL
- Not recorded
- Review type
- Standard Plan Examination
- Existing stories
- Not recorded
- Proposed stories
- 1
- Existing dwelling units
- Not recorded
- Proposed dwelling units
- 0








