NYC DOB record · Q08032504-C3

126-43 39 Avenue

126-43 39 Avenue, Queens, NY 11368

New building filing in Flushing-Willets Point, Queens. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q08032504-C3

126-43 39 Avenue

Queens, NY 11368

New building · status dated Oct 6, 2026

Current record
Under review
Proposed scale
12 stories
Dwelling units
534
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q08032504-C3 as a new building at 126-43 39 Avenue, Queens, NY 11368. Its latest published status category is Under review, dated Oct 6, 2026. The filing records 12 proposed stories and 534 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Oct 6, 2026
Proposed scale
12 proposed stories and 534 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 4624494Applicant of recordSee the 141 filings that name Gea Consulting Engineers
FiledOct 5, 2026
Current recordUnder review
Proposed scale12 stories
Recorded cost$15.3M

What the filing says

A public-record reading of the proposed work.

Mechanical work related to the construction of a new 12 story affordable housing building as per plans filed herewith.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 2024, on a 100,598 sq ft lot.

Built
2024
Last altered
2024
Floors
12
Building type
Condominium
Zoning district
C4-4
Lot area
100,598 sq ft
Building area
462,384 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q08032504-C3.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q08032504-C3
BBL
4018337501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
12
Existing dwelling units
Empty in the source
Proposed dwelling units
534