What the filing says
A public-record reading of the proposed work.
Removal of one roof tank. Installation of new sprinkler service, backflow preventer assembly, floor drain, sprinkler booster pump, and riser control valve. Installation of new test tee on domestic water service. No change to egress use or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story office building built in 1904, on a 5,800 sq ft lot.
- Built
- 1904
- Last altered
- 1982
- Floors
- 7
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-8A/R11
- Lot area
- 5,800 sq ft
- Building area
- 35,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 37 notices on file; the most recent was issued Feb 21, 2018.
- Facade safety program
Issued Feb 21, 2018
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01099103-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01099103-I1
- BIN
- 1014980
- BBL
- 1008000023
- Postal code
- 10011 · 903 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0