What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1965, with 156 homes, on a 59,200 sq ft lot.
- Built
- 1965
- Floors
- 6
- Residential units
- 156
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 59,200 sq ft
- Building area
- 149,520 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 55 notices on file; the most recent was issued Apr 23, 2025.
- Construction
Issued Apr 23, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPE CTION,OBSERVED AT EXP2 NORTH ELEV,A BROKEN WINDOW ON THE FIRST FLOOR AT ROOF,LOOSE BRICK ON CHIMNEY WAS OBSERVED AND BROKEN UNHINGED EGRESS DOOR AT ROOF.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Oct 29, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED ON EXP #2 NORTH ELEV: BROKEN WINDOW PANES ON 2FL EXP#4 SOUTH ELEV:LOOSE METAL CAPPING ON PARAPET. ROOF: CRACKED, DAMAGED MORTAR JOINTS ON COMPACTOR BRICK VENT STOCK ON ROOF. REMEDY: REPAIR AND/OR REPLACE ALL DAMAGED FACADE & APPURTENANCES
- Hazardous condition (facade)
Issued Feb 11, 2022 — CYCLE 9B UNSAFE REPORT FILED
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00077926-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00077926-I1
- BBL
- 3077770026
- Postal code
- 11234 · 1339 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








