NYC DOB record · M01248825-I1

128 West 72 Street

128 West 72 Street, Manhattan, NY 10023

Alteration filing in Upper West Side-Lincoln Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01248825-I1

128 West 72 Street

Manhattan, NY 10023

Alteration filing · status dated Aug 31, 2026

Current record
Recorded as completed
Proposed scale
5 stories
Dwelling units
5
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01248825-I1 as a alteration filing at 128 West 72 Street, Manhattan, NY 10023. Its latest published status category is Recorded as completed, dated Aug 31, 2026. The filing records 5 proposed stories and 5 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 31, 2026
Proposed scale
5 proposed stories and 5 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1079315Applicant of recordSee the 3 filings that name Jongseo Kim Architect PC
FiledJul 8, 2025
Current recordRecorded as completed
Proposed scale5 stories
Recorded cost$25,365

What the filing says

A public-record reading of the proposed work.

Tenant fit-out interior renovation for kine musubi take-out store including new partitions, kitchen equipment, lighting, interior finishes ,and millwork within demised tenant space. no change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1935, with 7 homes, on a 2,464 sq ft lot.

Built
1935
Floors
5
Residential units
7
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
C4-6A
Lot area
2,464 sq ft
Building area
10,969 sq ft
Historic district
Upper West Side / Central Park West Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 14 notices on file; the most recent was issued Jul 9, 2019.

  • Fail to certify class

    Issued Jul 9, 2019 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Low pressure boiler

    Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT

  • Landmark

    Issued Jun 26, 2006

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01248825-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01248825-I1
BBL
1011430044
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
5
Proposed dwelling units
5
General construction