What the filing says
A public-record reading of the proposed work.
FACADE RESTORATION: AT EXP1 DEFECTED BALCONY AND OBJECT HANGING, CRACKS & METAL CORRECTIONS.EXP2 & 3 CRACK, SPALL'G & DEFECTED WINDOW FRAMES WITH CRACK WINDOW PANE EXP3 AT 3RD FL.EXP4 CRACK AT 1st FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story condominium built in 1996, with 116 homes, on a 44,855 sq ft lot.
- Built
- 1996
- Floors
- 6
- Residential units
- 116
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 44,855 sq ft
- Building area
- 82,978 sq ft
- Historic district
- Cobble Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued Nov 18, 2025.
- Construction
Issued Nov 18, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 DEFECTED BALCONY AND OBJECT HANGING,CRACKS AND METAL CORROSIONS.EXP2 A ND 3 CRACK,SPALLING AND DEFECTED WINDOW FRAMES WITH CRACK WINDOW PANE EXP3 AT 3RD FL.EXP4 CRACK AT 1ST FLOOR.REMEDY:MAINTAIN BUILDING,REPAIR AND/OR REPLACE
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01382092-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01382092-I1
- BBL
- 3003057501
- Postal code
- 11201 · 5869 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 24
- Proposed dwelling units
- 24