NYC DOB record · S01398743-P1

129 Gansevoort Boulevard

129 Gansevoort Boulevard, Staten Island, NY 10314

Alteration filing in Westerleigh-Castleton Corners, Staten Island. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01398743-P1

129 Gansevoort Boulevard

Staten Island, NY 10314

Alteration filing · status dated Oct 13, 2026

Current record
Under review
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01398743-P1 as a alteration filing at 129 Gansevoort Boulevard, Staten Island, NY 10314. Its latest published status category is Under review, dated Oct 13, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 13, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
The building, not the filingopen housing violations and every filing at BIN 5018205Applicant of recordSee the 7 filings that name Sco Engineering
FiledOct 13, 2026
Current recordUnder review
Proposed scale2 stories
Recorded cost$83,700

What the filing says

A public-record reading of the proposed work.

Vertical extension of an existing one-family residence, including interior renovations. no change of use, occupancy or egress

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1.5-story one-family home built in 1935, on a 4,400 sq ft lot.

Built
1935
Floors
1.5
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R3-1
Lot area
4,400 sq ft
Building area
1,024 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Aug 12, 2025.

  • Construction

    Issued Aug 12, 2025 — ATOI OBSERVED BEARING WALLS REMOVED AND REPLACED WITH 2X6 HEADERS SPANNING 12'. IN THE BASEMENT FOUNDATION WALL BREACHED IN 2 LOCATIONS TO INSTALL DOORS. FOUNDATION WALL AT EXTERIOR UNDER STAIRS BREACHED TO INSTALL NEW ENTRY. STRUCUTRAL STABILITY IS IN QUESTION. NO PLANS ON FILE WITH THE DEPT.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01398743-P1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01398743-P1
BBL
5007190066
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
1
Proposed dwelling units
1
General construction