What the filing says
A public-record reading of the proposed work.
Ira for the vertical cable tray location inspection
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story condominium built in 1988, with 14 homes, on a 8,000 sq ft lot.
- Built
- 1988
- Floors
- 3
- Residential units
- 14
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- R4
- Lot area
- 8,000 sq ft
- Building area
- 15,511 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 20 open notices on record for this building, out of 38 notices on file; the most recent was issued Sep 6, 2019.
- (other bldgs types) - elevator affirmation of
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
- Low pressure boiler
Issued Feb 24, 2017 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
17 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01471678-I1.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01471678-I1
- BIN
- 4311348
- BBL
- 4063567501
- Postal code
- 11355 · 281 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source