NYC DOB record · Q00714437-Z1

130 Beach 120 Street

130 Beach 120 Street, Queens, NY 11694

New building filing in Breezy Point-Belle Harbor-Rockaway Park-Broad Channel, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00714437-Z1

130 Beach 120 Street

Queens, NY 11694

New building · status dated Sep 29, 2026

Current record
Approved
Proposed scale
8 stories
Dwelling units
46
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00714437-Z1 as a new building at 130 Beach 120 Street, Queens, NY 11694. Its latest published status category is Approved, dated Sep 29, 2026. The filing records 8 proposed stories and 46 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
8 proposed stories and 46 proposed dwelling units
The building, not the filingEvery filing at BIN 4626289, with the parcel and violation recordApplicant of recordSee the 380 filings that name Vasilios Artemiou PE
FiledMay 9, 2024
Current recordApproved
Proposed scale8 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Install new temporary standpipe system for new building q00714437-i1.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a elevator apartment building built in 2024, with 48 homes, on a 4,500 sq ft lot.

Built
2024
Residential units
48
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
4,500 sq ft
Building area
46,092 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00714437-Z1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00714437-Z1
BBL
4162290048
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
8
Existing dwelling units
Empty in the source
Proposed dwelling units
46