What the filing says
A public-record reading of the proposed work.
Interior renovation of unit 15e on the 015 floor. no change in use, occupancy, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story condominium built in 1960, with 73 homes, on a 9,633 sq ft lot.
- Built
- 1960
- Floors
- 15
- Residential units
- 73
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-8X
- Lot area
- 9,633 sq ft
- Building area
- 115,462 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 30 notices on file; the most recent was issued Jan 26, 2018.
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
- Construction
Issued Dec 20, 2009
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01317783-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01317783-I1
- BIN
- 1042069
- BBL
- 1013977504
- Postal code
- 10065 · 695 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 74
- Proposed dwelling units
- 74








