NYC DOB record · B01224587-I1

130 Jackson Street

130 Jackson Street, Brooklyn, NY 11211

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01224587-I1

130 Jackson Street

Brooklyn, NY 11211

Alteration filing · status dated Oct 23, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
21
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01224587-I1 as a alteration filing at 130 Jackson Street, Brooklyn, NY 11211. Its latest published status category is Recorded as completed, dated Oct 23, 2026. The filing records 21 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 23, 2026
Proposed scale
21 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3392157Applicant of recordSee the 63 filings that name Rand Engineering & Architecture, Dp
FiledAug 29, 2025
Current recordRecorded as completed
Proposed scale21 units
Recorded cost$118,500

What the filing says

A public-record reading of the proposed work.

Limited Drainage System Repair Program; includes installation of a Duplex Ejector Pump and Backwater valve at cellar level. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story condominium built in 2007, with 21 homes, on a 7,436 sq ft lot.

Built
2007
Floors
4
Residential units
21
Building type
Condominium
Land use
Elevator apartments
Zoning district
R6B
Lot area
7,436 sq ft
Building area
21,961 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 33 notices on file; the most recent was issued Aug 2, 2022.

  • Failure to

    Issued Aug 2, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Feb 2, 2021 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Nov 2, 2020 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01224587-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01224587-I1
BBL
3027497501
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
21
Proposed dwelling units
21