NYC DOB record · M01132994-P2

130 West 131 Street

130 West 131 Street, Manhattan, NY 10027

Alteration filing in Harlem (North), Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01132994-P2

130 West 131 Street

Manhattan, NY 10027

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01132994-P2 as a alteration filing at 130 West 131 Street, Manhattan, NY 10027. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 4 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
4 proposed stories and 4 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1058059Applicant of recordSee the 84 filings that name Chun Engineering Consultant PLLC
FiledNov 4, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$130,009

What the filing says

A public-record reading of the proposed work.

Subsequent structural filing. removal and reconfiguration of interior wall on all levels. removal of columns in cellar and restructuring of basement floor. removal of basement and 1st floor rear facade. new rear enlargement and roof stair bulkhead.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1887, with 4 homes, on a 1,998 sq ft lot.

Built
1887
Last altered
2003
Floors
3
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-2
Lot area
1,998 sq ft
Building area
3,000 sq ft
Historic district
Central Harlem West -- 130-132nd Street Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 4 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01132994-P2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 98,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01132994-P2
BBL
1019150047
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
4
Proposed dwelling units
4
Structural work