What the filing says
A public-record reading of the proposed work.
Installation of medium duty pipe scaffolding as per plans. no change in use occupancy or egress under this application. pipe scaffolding shall comply with chapter 33 of the 2014 building code. sidewalk shed filed under separate application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story store building built in 1925, on a 18,873 sq ft lot.
- Built
- 1925
- Last altered
- 2020
- Floors
- 7
- Residential units
- 0
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- R7X
- Lot area
- 18,873 sq ft
- Building area
- 115,667 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 48 open notices on record for this building, out of 73 notices on file; the most recent was issued Sep 22, 2026.
- Construction
Issued Sep 22, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OBSERVED AT EXPOSURES 2,3,4 DAMAGED/CRACKED/ SPALLING BRICKWORK AT MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE DEFECTIVE AREA
- Construction
Issued Apr 23, 2025 — FAILURE TO MAINTAIN BUILDINGS IN CODE COMPLIANT MANNER.OBSERVED HAZARD OUS CONDITIONS AT EVERY EXPOSURES.MISSING/BROKEN WINDOW,CRACKS STONE,M ISSING BRICKS WITH LONG VERTICAL CRACK/WALL MOVEMENT AT EXP2 FACING PA RKING LOT.REMEDY:REPAIR AND/OR REPLACE
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
45 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00001770-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00001770-I1
- BBL
- 3070640016
- Postal code
- 11224 · 1132 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source