What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300 psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1899, with 3 homes, on a 2,000 sq ft lot.
- Built
- 1899
- Floors
- 3
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R5
- Lot area
- 2,000 sq ft
- Building area
- 3,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 13 notices on file; the most recent was issued Sep 9, 2026.
- Construction
Issued Sep 9, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING CONDITIONS. EXPOSURE 1 DAMAGED MASONRY,CRACK WINDOW PANE, LOOSE TRIMS & PANELS. EXPOSURE 4: DAMAGED AND LOOSE METAL TRIMS AT PARAPET. ALSO MISSING PANEL AT EXPOSURE 1. REMEDY: REPAIR AND;OR PLACE
- Construction
Issued Mar 3, 2026 — BUILDING IS LEANING TO THE RIGHT FROM ADJACENT PROPERTY. FLASHING AT EXPOSURE 4 PARAPET IS STARTING TO WARP. OBSERVED CRACKS AT BASE OF EXPOSURE 1. CORNER OF EXPOSURE 1 AND 4 IS DEVELOPING CRACKS THAT ARE SEPARATING PANELING FROM BUILDING FROM THE GROUND UP.
- Construction
Issued Oct 17, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF NYC ADMIN CODE. AS NOTED AT TIME OF INSPECTION OBSERVED @ EXPOSURE 4 DAMAGED FLASHING AT PARAPET LEVEL. ALSO SPALLING STUCCO AT EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00568273-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00568273-I1
- BIN
- 3008793
- BBL
- 3005970015
- Postal code
- 11231 · 2714 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








