What the filing says
A public-record reading of the proposed work.
Mechanical means will be used to assist on grade and chute will be used to lower debris from floor to floor
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story hotel built in 1925, on a 17,968 sq ft lot.
- Built
- 1925
- Last altered
- 2018
- Floors
- 5
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- C6-3X
- Lot area
- 17,968 sq ft
- Building area
- 32,347 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 20, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01145303-S1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Full Demolition Signed-off.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01145303-S1
- BBL
- 1007990024
- Postal code
- 10011 · 903 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- Empty in the source
- Existing dwelling units
- 12
- Proposed dwelling units
- Empty in the source