NYC DOB record · Q00988198-I1

132-15 Pople Avenue

132-15 Pople Avenue, Queens, NY 11355

New building filing in Flushing-Willets Point, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00988198-I1

132-15 Pople Avenue

Queens, NY 11355

New building · status dated Sep 29, 2026

Current record
Approved
Proposed scale
7 stories
Dwelling units
39
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00988198-I1 as a new building at 132-15 Pople Avenue, Queens, NY 11355. Its latest published status category is Approved, dated Sep 29, 2026. The filing records 7 proposed stories and 39 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
7 proposed stories and 39 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 4626202Applicant of recordSee the 198 filings that name Ameriland Brook LLC
FiledJan 14, 2024
Current recordApproved
Proposed scale7 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Propose 7 story 39 apartments residential and community facility mixed use new building as per plans. obtain new c of o.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2025, with 39 homes, on a 10,508 sq ft lot.

Built
2025
Last altered
2023
Floors
7
Residential units
39
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
10,508 sq ft
Building area
47,291 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00988198-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00988198-I1
BBL
4051020054
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
7
Existing dwelling units
Empty in the source
Proposed dwelling units
39
General construction