What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed in accordance with nycc 2014 chapter 33 building code. no change in egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story elevator apartment building built in 2021, with 8 homes, on a 4,007 sq ft lot.
- Built
- 2021
- Last altered
- 2021
- Floors
- 5
- Residential units
- 8
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 4,007 sq ft
- Building area
- 11,533 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Mar 25, 2024.
- Construction
Issued Mar 25, 2024 — DUE TO THE WITHDRAWAL OF THE CONSTRUCTION SUPERINTENDENT OF RECORD THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED ALL WORK UNDER JOB 321751494 STOPPED UNTIL A NEW SUPERINTENDENT IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF AC, KINDLY CONTACT THE COMMISSIONERS OFFICE 718 802-3677
- Construction
Issued Mar 25, 2024 — DUE TO THE WITHDRAWAL OF THE CONSTRUCTION SUPERINTENDENT OF RECORD THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED ALL WORK UNDER JOB 321751494 STOPPED UNTIL A NEW SUPERINTENDENT IS IN PLACE AS PER ARTICLE 116 OF CHAPTER 1 OF TITLE 28 OF AC, KINDLY CONTACT THE COMMISSIONERS OFFICE 718 802-3677
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00682385-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00682385-I1
- BBL
- 3056630015
- Postal code
- 11219 · 2110 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 4