What the filing says
A public-record reading of the proposed work.
AT&T - Replacement of existing telecommunications antennas with replacement/installation of RRH. Removal and installations of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story place of worship built in 1931, on a 53,342 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R3-2
- Lot area
- 53,342 sq ft
- Building area
- 50,792 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 31 notices on file; the most recent was issued Apr 25, 2023.
- Low pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
7 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00018502-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
- Current status updated05
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00018502-I1
- BBL
- 3078810033
- Postal code
- 11234 · 918 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source