NYC DOB record · M00680590-I1

133 East 55 Street

133 East 55 Street, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00680590-I1

133 East 55 Street

Manhattan, NY 10022

Alteration filing · status dated Oct 1, 2026

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00680590-I1 as a alteration filing at 133 East 55 Street, Manhattan, NY 10022. Its latest published status category is Recorded as completed, dated Oct 1, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 1, 2026
Proposed scale
2 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1091783Applicant of recordSee the 197 filings that name Ancora Engineering, PLLC
FiledFeb 15, 2022
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Interior Demo of existing building. no change in use egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story elevator apartment building built in 2024, with 31 homes, on a 4,410 sq ft lot.

Built
2024
Last altered
2023
Floors
19
Residential units
31
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C5-2.5
Lot area
4,410 sq ft
Building area
58,592 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00680590-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00680590-I1
BBL
1013100014
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
0
Proposed dwelling units
0
General construction