What the filing says
A public-record reading of the proposed work.
Proposed exterior facade restoration as per plans. includes remedial work to correct DOB violation 100725cpi20402sb. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1931, with 28 homes, on a 6,065 sq ft lot.
- Built
- 1931
- Floors
- 6
- Residential units
- 28
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 6,065 sq ft
- Building area
- 25,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 19 notices on file; the most recent was issued Nov 12, 2025.
- Construction
Issued Nov 12, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#347915 VIO#100725PI20402SB DATED 10/07/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 11/12/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPARI BLDG IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#347915 VIO#100725PI20402SB TO REPAIR BLDG UNDER PERMIT
- Construction
Issued Oct 7, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD CRACKED DECORATIVE STONE @ MAIN ENTRANCE GROUND FLR.OBSVD @ EXP4 NEAR EXP1/4 PARAPET CRACKED/ SPALLING MASONRY & DETERIORATED MORTAR JOINTS. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG DETERMINE THE STRUCT STAB & PREPARE/FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT START WORK BY 11/7/2025
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01417131-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01417131-I1
- BIN
- 2003106
- BBL
- 2025060134
- Postal code
- 10452 · 206 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 28
- Proposed dwelling units
- 28