What the filing says
A public-record reading of the proposed work.
Proposed construction fence. no change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 4,007 sq ft lot.
- Last altered
- 2023
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- R6
- Lot area
- 4,007 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jun 16, 2026.
- Construction
Issued Jun 16, 2026 — FTC-VIO#072125CEU31210PW(#3A22460)ORDERED 1338 47 C/O WM REALTY MANAGEMENT TO HAVE EOR REVIEW.NON-CONFORMANCE OF CONCRETE TESTING PROC & SUBMIT S/S ACCEPTANCE STATEMENT W/ ALT TESTING RESULTS BY 9/12/25.AS OF 6/16/26 1338 47 LLC.HAS NOT COMPLIED WITH COMMISSIONER'S ORDER REMEDY:COMPLY W/ COMMISSIONER'S ORDER & CODE
- Construction
Issued Jul 21, 2025 — FAILURE TO PERFORM STANDARD-CURING SPECIMENS: DURING LAB INSPECTION @ HRF ON 7/1/2025, DOB OBSERVED DRY CYLINDERS STORED IMPROPERLY, NOT MEETING FINAL CURING REQUIREMENTS. REMEDY: COMPLY WITH CODES AND ASTM SUBMIT EOR-APPROVED ALTERNATE RESULTS BY 09/12/2025
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00953428-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00953428-I1
- BIN
- 3137240
- BBL
- 3056290022
- Postal code
- 11219 · 2089 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3