What the filing says
A public-record reading of the proposed work.
Plumbing modifications for apt 9d as per plans filed herewith. no change to use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story condominium built in 1925, with 53 homes, on a 8,757 sq ft lot.
- Built
- 1925
- Last altered
- 1988
- Floors
- 9
- Residential units
- 53
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 8,757 sq ft
- Building area
- 48,620 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 41 notices on file; the most recent was issued Feb 20, 2024.
- Hazardous condition (facade)
Issued Feb 20, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Plumbing
Issued Aug 1, 2023 — ACCESS TO PREMISES TO INSPECT APPROVED WORK UNDER ACTIVE LAA PERMIT M00907498 DENIED INSPECTION AT 232PM AT THE ABOVE DATE . NEED ACCESS TO VERIFY WORK. PROVIDE ACCESS TO DEPARTMENT PERSONAL.
- No report and / or late filing (facade)
Issued Dec 31, 2013 — FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01439383-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01439383-S1
- BBL
- 1012237504
- Postal code
- 10025 · 286 filings
- Review type
- Standard Plan Examination
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 54
- Proposed dwelling units
- 54