NYC DOB record · Q00337293-I1

135-20 39 Avenue

135-20 39 Avenue, Queens, NY 11354

Alteration filing in Flushing-Willets Point, Queens. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00337293-I1

135-20 39 Avenue

Queens, NY 11354

Alteration filing · status dated Aug 28, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
173
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00337293-I1 as a alteration filing at 135-20 39 Avenue, Queens, NY 11354. Its latest published status category is Recorded as completed, dated Aug 28, 2026. The filing records 173 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 28, 2026
Proposed scale
173 proposed dwelling units
Applicant of recordSee the 2 filings that name Southport Engineering Associates PC
FiledApr 2, 2020
Current recordRecorded as completed
Proposed scale173 units
Recorded cost$350,000

What the filing says

A public-record reading of the proposed work.

Removal, Replacement and New Installation of Condenser Water Heat Pumps, Split Heat Pump System, Fire Smoke Dampers, Louvers, Smoke Purge Fans, Ducts, Piping Etc. This is being Filed in Conjunction with the Alt Type I Job no: 421950598.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story hotel built in 1989, on a 31,452 sq ft lot.

Built
1989
Last altered
2016
Floors
15
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C4-2
Lot area
31,452 sq ft
Building area
237,452 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 211 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00337293-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00337293-I1
BIN
4112316
BBL
4049760015
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
173
Proposed dwelling units
173
mechanical