What the filing says
A public-record reading of the proposed work.
Job filed repair existing including new gyp. board, new painting, replace ceiling tile due to flood damage as per plan. alt co job filed under #q00687075. no change of use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1987, on a 1,733 sq ft lot.
- Built
- 1987
- Floors
- 3
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C4-2
- Lot area
- 1,733 sq ft
- Building area
- 4,419 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 8 notices on file; the most recent was issued Jan 19, 2026.
- Construction
Issued Jan 19, 2026 — BUILDING NO LONGER CODE COMPLIANT DUE TO FIRE, STRUCTURAL DAMAGE TO WO OD FRAME WALLS, CEILING AND ROOF LARGE OPEN HOLE IN ROOF. DAMAGE FROM FIRE ,SMOKE AND WATER ON ALL LEVELS. OWNER MUST HIRE A NYSLPE TO SUBMI T REPORT WITH PLANS , PHOTOS AND REPAIRS TIMELINE TO DOB WITHIN 15 DAY S TO ERTINSPECTIONS@BUILDINGS.NYC.GOV
- Construction
Issued Jan 19, 2026 — BUILDING NO LONGER CODE COMPLIANT DUE TO FIRE. STRUCTURAL DAMAGE TO WO OD FRAME OF WOOD FRAMING OF WALLS AND CEILING, ROOF OPEN LARGE HOLES FIRE DAMAGE AND WATERE, SMOKE TO FULL BUILDING ALL 3 LEVELS, MOST WALL S AND CEILINGS MISSING AND OPEN 2ND AND 3RD FLOOR, FULL VACATE ALL FLO ORS. RAIR BUILDING AND MAKE CODE COMPLIANT
- Electric
Issued Jan 20, 1993
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01355811-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01355811-I1
- BBL
- 4050360144
- Postal code
- 11354 · 386 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0