What the filing says
A public-record reading of the proposed work.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1930, with 29 homes, on a 6,464 sq ft lot.
- Built
- 1930
- Last altered
- 1986
- Floors
- 6
- Residential units
- 29
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 6,464 sq ft
- Building area
- 26,070 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 27 notices on file; the most recent was issued Dec 16, 2024.
- Elevator
Issued Dec 16, 2024 — DAMAGE TO 6TH FLOOR HOISTWAY DOOR INTERLOCK AND CAR DOOR. OIL ON BRAKE SHOES. MUST REPLACE AND RE- INSPECTED BY A D.O.B. INSPECTOR. CEASE USE
- Construction
Issued Dec 13, 2024 — STRUCTURAL RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED ELEVATOR CABIN SLIDING DOOR PARTIALLY REMOVED AT 6 FLOOR TO EVACUATE INDIVIDUALS FROM ELEVATOR.
- Failure to correct swarmp conditions (facade)
Issued Dec 23, 2021 — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00516903-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00516903-I1
- BIN
- 1019480
- BBL
- 1008950031
- Postal code
- 10016 · 499 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 29
- Proposed dwelling units
- 29








