What the filing says
A public-record reading of the proposed work.
Filing for the plumbing work in conjunction with the interior renovation. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1903, with 41 homes, on a 9,000 sq ft lot.
- Built
- 1903
- Floors
- 7
- Residential units
- 41
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7A
- Lot area
- 9,000 sq ft
- Building area
- 41,925 sq ft
- Historic district
- Park Slope Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 36 notices on file; the most recent was issued Aug 20, 2025.
- Construction
Issued Aug 20, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO FAILURE TO MAINTAIN STRUCTURE STRUCTURAL CRACKS OBSERVED AT APARTMENT 23A WALL. TEMPORARY SHORING INSTALLED UNDER PERMIT B01276217 VACATE ENTIRE APARTMENT 11 AND APPROXIMATELY 17'BY THE DEPTH OG THE AP ARTMENT AT THE APARTMENT 23A ONLY
- Construction
Issued Aug 20, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO CONSTRUCTION ACTIVIES AT APT 11 AT THE 1ST FLOOR AND APT 23A/B AT THE 2ND FLOOR - STRUCTURAL CRACKS OBSERVED AT APT 23A WALL WITH UNPERMITTED SHORING WORK BEING DONE AT APT 11. VACATE ENTIRE APT 11 AND APPROX 17 FT BY THE DEPTH OF THE APARTMENT AT APT 23A ONLY.
- (other bldgs types) - elevator affirmation of
Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
4 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00413646-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00413646-I1
- BBL
- 3010910035
- Postal code
- 11215 · 2962 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 40
- Proposed dwelling units
- 40