What the filing says
A public-record reading of the proposed work.
Interior renovation to existing warming pantry as shown on plans. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story care home built in 1973, with 210 homes, on a 21,231 sq ft lot.
- Built
- 1973
- Last altered
- 2012
- Floors
- 12
- Residential units
- 210
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- C6-3X
- Lot area
- 21,231 sq ft
- Building area
- 159,606 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 59 notices on file; the most recent was issued Jan 29, 2026.
- Construction
Issued Jan 29, 2026 — I OBSERVED ELECTRICAL EQUIPMENT IN APT 712, LIGHT FIXTURES,WIRES EXPOSED AND BREAKER PANEL DAMAGE DUE TO FIRE.
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9A UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01402088-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01402088-I1
- BBL
- 1007990021
- Postal code
- 10011 · 747 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 215
- Proposed dwelling units
- 215








