What the filing says
A public-record reading of the proposed work.
Modifications to existing HVAC system including installation of new type II exhaust hood for existing warming pantry. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story care home built in 1973, with 210 homes, on a 21,231 sq ft lot.
- Built
- 1973
- Last altered
- 2012
- Floors
- 12
- Residential units
- 210
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- C6-3X
- Lot area
- 21,231 sq ft
- Building area
- 159,606 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 59 notices on file; the most recent was issued Jan 29, 2026.
- Construction
Issued Jan 29, 2026 — I OBSERVED ELECTRICAL EQUIPMENT IN APT 712, LIGHT FIXTURES,WIRES EXPOSED AND BREAKER PANEL DAMAGE DUE TO FIRE.
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9A UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01402088-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01402088-S1
- BBL
- 1007990021
- Postal code
- 10011 · 747 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 215
- Proposed dwelling units
- 215