What the filing says
A public-record reading of the proposed work.
Application is filed for the developement of (5) semi-attached 2-family 3 story residential buildings on each fo the separate zoning lots with (5) tax lots. all work as per plan submitted herewith. certificate of occupancy to be issued under this app.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01343166-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01343166-I1
- BIN
- 5177390
- BBL
- Empty in the source
- Postal code
- 10308 · 98 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 3
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 2








