NYC DOB record · B00355879-I1

1365 Nostrand Avenue

1365 Nostrand Avenue, Brooklyn, NY 11226

Alteration filing in East Flatbush-Erasmus, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00355879-I1

1365 Nostrand Avenue

Brooklyn, NY 11226

Alteration filing · status dated Dec 2, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
22
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00355879-I1 as a alteration filing at 1365 Nostrand Avenue, Brooklyn, NY 11226. Its latest published status category is Recorded as completed, dated Dec 2, 2021. The filing records 22 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 2, 2021
Proposed scale
22 proposed dwelling units
Complete building dossierView all 15 filings associated with BIN 3428865Applicant of recordSee the 69 filings that name Diego Aguilera Architects P.C.
FiledJun 19, 2020
Current recordRecorded as completed
Proposed scale22 units
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Curb Cut application filed herewith in conjunction with New Building, Job #321590989.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2022, with 22 homes, on a 4,040 sq ft lot.

Built
2022
Floors
7
Residential units
22
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
4,040 sq ft
Building area
15,316 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00355879-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00355879-I1
BBL
3048530011
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
22
Proposed dwelling units
22