1370 Avenue of the Americas

1370 Avenue of the Americas, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01353097-I1

1370 Avenue of the Americas

Manhattan, NY 10019

Alteration filing · status dated Sep 9, 2026

Current record
Recorded as completed
Proposed scale
32 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01353097-I1 as a alteration filing at 1370 Avenue of the Americas, Manhattan, NY 10019. Its latest published status category is Recorded as completed, dated Sep 9, 2026. The filing records 32 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 9, 2026
Proposed scale
32 proposed stories
Complete building dossierView all 9 filings associated with BIN 1034855Applicant of recordSee the 10 filings that name Env Architects DPC
FiledFeb 10, 2026
Current recordRecorded as completed
Proposed scale32 stories
Recorded cost$160,045

What the filing says

A public-record reading of the proposed work.

General construction modifications taking place on 15th floor (16th Floor marketing) as per drawings filed herewith. No chance in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 32-story office building built in 1971, on a 14,059 sq ft lot.

Built
1971
Last altered
2002
Floors
32
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-6
Lot area
14,059 sq ft
Building area
311,501 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 152 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 2 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01353097-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01353097-I1
BBL
1012710071
Review type
Professional Certification
Existing stories
32
Proposed stories
32
Existing dwelling units
0
Proposed dwelling units
0
General construction