What the filing says
A public-record reading of the proposed work.
Herewith filing for waterproofing weather protections as per plans. no change to use,egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story health facility built in 1973, on a 10,000 sq ft lot.
- Built
- 1973
- Floors
- 1
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Building area
- 18,816 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 4 notices on file; the most recent was issued May 3, 2024.
- Construction
Issued May 3, 2024 — STRUCTURE RENDERED NON COMPLAINT. OBSERVED EXCESSIVE AMOUNT DEBRIS FALLING ONTO ROOF DUE TO ADJACENT BUILDING 1379 BUSHWICK AVENUE SUSTAINED FIRE DAMAGE. VACATE ENTIRE ROOF
- Immediate
Issued May 3, 2024 — ERECT SIDEWALK SHED AT EXP# 1 (BUSHWICK AVENUE) APPROX 20' LINEAR FEET STARTING FROM 1379 BUSHWICK AVENUE TO COVR THE ENTRANCE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01389589-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01389589-I1
- BIN
- 3079655
- BBL
- 3034330005
- Postal code
- 11207 · 3329 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 6
- Proposed dwelling units
- 6