What the filing says
A public-record reading of the proposed work.
Facade repair throughout. No change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1950, with 90 homes, on a 143,991 sq ft lot.
- Built
- 1950
- Floors
- 3
- Residential units
- 90
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R3-2
- Lot area
- 143,991 sq ft
- Building area
- 82,296 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Sep 28, 2024.
- Construction
Issued Sep 28, 2024 — EMERGENCY WORK ORDER:TO SECURE UNSAFE FACADE.LEANING PARAPET WALL OF ENTIRE NORTH FACADE @ EXP3,N ELEV & LEANING PARAPET WALL OF ENTIRE SOUTH FACADE @ EXP1,S ELEVS.CRACKED/SPALLED BRICKS, STEP CRACK @ EXP1 SOUTH ELEVS VARIOUS LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXPS 1,2,3: SOUTH, WEST & NORTH ELEVATIONS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01475382-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01475382-I1
- BIN
- 4450198
- BBL
- 4064840002
- Postal code
- 11367 · 140 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 90
- Proposed dwelling units
- 90








