NYC DOB record · Q01214209-S7

138-34 78 Road

138-34 78 Road, Queens, NY 11367

New building filing in Kew Gardens Hills, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01214209-S7

138-34 78 Road

Queens, NY 11367

New building · status dated Oct 27, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01214209-S7 as a new building at 138-34 78 Road, Queens, NY 11367. Its latest published status category is Approved, dated Oct 27, 2026. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 27, 2026
Proposed scale
3 proposed stories and 1 proposed dwelling unit
The building, not the filingopen housing violations and every filing at BIN 4143129Applicant of recordSee the 96 filings that name R & O Engineering
FiledApr 14, 2026
Current recordApproved
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Support of Excavation drawings for 3 story, one family house.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a vacant land on a 5,500 sq ft lot.

Last altered
2022
Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R2X
Lot area
5,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Jul 5, 2023.

  • Construction

    Issued Jul 5, 2023 — FTM-BLDG SUFFRD FIRE DMG ON 5/30/22.BLDG SUFFRD FROM FTM CNDTNS@EXP3 & ROOF.ROOF PARTLY OPEN &EXPOSD TO THE ELEMNTS.EXP3 FIREDMGD NOT PROPRLY SEALD,FACADE REMAINDR LOOSLY HANGING.BLDG CONT-DETRIOR.FAIL TO COMPLY W/COMMISH ORDR#341365(053023FEU40801ZT)RQRING OWNR RPR BLDG UNDR PRMT IMMED COMPLY W/COMMISH ORDR#341305

  • Construction

    Issued May 30, 2023 — FTM-BLDG SUFFRD FIRE DMG ON 5/30/22.BLDG SUFFRD FROM FTM CONDITIONS@ EXP3 &ROOF.ROOF PARTLY OPEN&EXPOSED TO THE ELEMENTS.EXP3 FIRE DAMAGED NOT PROPERLY SEALED,FACADE REMAINDR LOOSLY HANGING.BLDG CONT-DETERIOR OWNR TO IMMED RTAIN NYSPE-EVAL ENTIRE BLDG.RPRARE/FILE RPR DRWNGS& DTRMINE STRCTRL STBILITY.BLDG RPR UNDR PRMT STRT 6/12/23

  • Construction

    Issued May 30, 2022 — STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE, AND WATER DAMAGE THROUGHOUT STRUCTURE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01214209-S7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01214209-S7
BBL
4066100022
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
1