NYC DOB record · Q01461585-I1

138-38 37 Avenue

138-38 37 Avenue, Queens, NY 11354

Alteration filing in Flushing-Willets Point, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01461585-I1

138-38 37 Avenue

Queens, NY 11354

Alteration filing · status dated Sep 25, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
156
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01461585-I1 as a alteration filing at 138-38 37 Avenue, Queens, NY 11354. Its latest published status category is Approved, dated Sep 25, 2026. The filing records 156 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 25, 2026
Proposed scale
156 proposed dwelling units
Applicant of recordSee the 14 filings that name Lawrence K. Shapiro Engineering
FiledSep 23, 2026
Current recordApproved
Proposed scale156 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation and use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB Q01327168-I1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 27, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01461585-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01461585-I1
BIN
4625945
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
156
Proposed dwelling units
156