What the filing says
A public-record reading of the proposed work.
Mechanical work related to interior build-out of space as shown on plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 57-story condominium built in 2017, with 458 homes, on a 21,474 sq ft lot.
- Built
- 2017
- Last altered
- 2017
- Floors
- 57
- Residential units
- 458
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4.5
- Lot area
- 21,474 sq ft
- Building area
- 530,633 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 83 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- No report and / or late filing (facade)
Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
- Elevator
Issued May 5, 2016
12 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00423615-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00423615-I1
- BBL
- 3001497502
- Postal code
- 11201 · 5544 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 483
- Proposed dwelling units
- 483