What the filing says
A public-record reading of the proposed work.
Emergency stabilization of unpermitted enlargement of existing building
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story two-family home built in 1925, on a 3,000 sq ft lot.
- Built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R4-1
- Lot area
- 3,000 sq ft
- Building area
- 1,757 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Dec 29, 2025.
- Construction
Issued Dec 29, 2025 — UNPERMITTED 1-STORY REAR EXTENSION APPROX 18X22 FT W. CMU WALLS & WOOD FRAMING FOUND UNINSPECTED & UNDESIGNED. STRUCTURE POSES HAZARD TO .LIFE AND PROPERTY. REMEDY: RETAIN NYS PE FOR WEEKLY STABILITY RPTS FIRST DUE 1/2/26 EMAIL SIGNED/SEALED REPORTS W/ PHOTOS TO CSE WEEKLY
- Construction
Issued Dec 29, 2025 — UNPERMITTED 1 STORY REAR EXTENSION, (CMU FOUNDATION, WOODFRAME). NON- CONTINUOUS/SPLICED ROOF JOISTS. APPROX 18X22 FT STRUCTURE IS UNDESIGNED, UNINSPECTED, AND HAZARDOUS. REMEDY: RETAIN NYS PE FOR TEMP SHORING/BRACING. SUBMIT DRWGS BY 1/2/25. STRT BY 1/7/26. SEND UP DATES TO CONSTRUCTION SAFETY ENGINEERING
- Construction
Issued Dec 24, 2025 — OBSERVED UNPERMITTED/UNDOCUMENTED/UNPLANNED HORIZONTAL AND VERTICAL EXTENSION IN THE BACK OF THE BUILDING APPROXIMATELY18' X 15' X10' HIGH WITH WINDOWS AND ROOF. JOB IS APPROXIMATELY 60% COMPLETED. NO PERMIT/PLANS FOR THIS STRUCTURAL WORK AT THE TIME OF INSPECTION.
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01357055-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01357055-I1
- BIN
- 4207231
- BBL
- 4097000020
- Postal code
- 11435 · 63 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2