NYC DOB record · M01234899-I1

139 East 94 Street

139 East 94 Street, Manhattan, NY 10128

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01234899-I1

139 East 94 Street

Manhattan, NY 10128

Alteration filing · status dated Sep 16, 2026

Current record
Recorded as completed
Proposed scale
11 stories
Dwelling units
41
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01234899-I1 as a alteration filing at 139 East 94 Street, Manhattan, NY 10128. Its latest published status category is Recorded as completed, dated Sep 16, 2026. The filing records 11 proposed stories and 41 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 16, 2026
Proposed scale
11 proposed stories and 41 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1048419Applicant of recordSee the 2 filings that name David Mann Architect
FiledAug 6, 2025
Current recordRecorded as completed
Proposed scale11 stories
Recorded cost$25,060

What the filing says

A public-record reading of the proposed work.

General construction proposed in existing unit #6C on the 6th floor. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 11-story elevator apartment building built in 1928, with 41 homes, on a 7,337 sq ft lot.

Built
1928
Floors
11
Residential units
41
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C1-8X
Lot area
7,337 sq ft
Building area
67,882 sq ft
Historic district
Expanded Carnegie Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 40 notices on file; the most recent was issued Apr 30, 2019.

  • No report and / or late filing (facade)

    Issued Apr 30, 2019 — FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • Low pressure boiler

    Issued May 15, 2014 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01234899-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01234899-I1
BBL
1015230014
Review type
Standard Plan Examination
Existing stories
11
Proposed stories
11
Existing dwelling units
41
Proposed dwelling units
41
General construction