NYC DOB record · B00620101-I1

139 Harman Street

139 Harman Street, Brooklyn, NY 11221

Alteration filing in Bushwick (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00620101-I1

139 Harman Street

Brooklyn, NY 11221

Alteration filing · status dated May 4, 2022

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
12
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00620101-I1 as a alteration filing at 139 Harman Street, Brooklyn, NY 11221. Its latest published status category is Recorded as completed, dated May 4, 2022. The filing records 3 proposed stories and 12 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 4, 2022
Proposed scale
3 proposed stories and 12 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3325658Applicant of recordSee the 136 filings that name Christopher Compton
FiledApr 11, 2022
Current recordRecorded as completed
Proposed scale3 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Restoration of water-damaged apartments as a result of inundation from hurricane ida. no change to use, egress, occupancy, or fire protection. areas of work listed in location information and comments sections.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1982, with 48 homes, on a 83,632 sq ft lot.

Built
1982
Last altered
2019
Floors
3
Residential units
48
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
83,632 sq ft
Building area
49,520 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 10 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00620101-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00620101-I1
BBL
3032760001
Review type
Professional Certification
Existing stories
3
Proposed stories
3
Existing dwelling units
12
Proposed dwelling units
12
General construction