What the filing says
A public-record reading of the proposed work.
Installation of a temporary scaffold as per plans in conjunction with general construction. no change in use, egress or occupancy. scaffold shall comply with 2014 NYC building code, chapter 33.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story office building built in 1918, on a 112,666 sq ft lot.
- Built
- 1918
- Last altered
- 2015
- Floors
- 7
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M3-1
- Lot area
- 112,666 sq ft
- Building area
- 382,080 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 166 notices on file; the most recent was issued Jan 22, 2025.
- Fail to certify class
Issued Jan 22, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Nov 15, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACK IN THE SUPPORT COLUMNS THROUGHOUT THE UNDERGROUND PARKING AREA, ALONG WITH CRACKS IN THE EXTERIOR WALLS OF PARKING GARAGE
- Elevator
Issued Nov 15, 2004
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00096455-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00096455-I1
- BBL
- 3008030192
- Postal code
- 11232 · 1595 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source